19 May 2017 – Mock-ups of the brickwork were made at the construction site of Churchillpark. The brightly red bricks of the atrium block appear very well. The two point blocks and row housing are in decent yellow-brown tones. The angles of bay windows and the entrances arches are visible. The first window frames are expected in three weeks after which the actual laying of the brick can begin.